Parks & Landscape
Laguna Lake Dog Park Revitalization​
Location: San Luis Obispo, CA.
Brief: Laguna Lake Dog Park Revitalization Base Bid contract time is established as 80 working days.
Plans call for site work, and paving for a playground / park / athletic field; sidewalk/parking lot, and water/sewer.
Scope of Work: Initiating Meeting - Activity List Draft Preliminary Schedule - Baseline Schedule.
Orange Memorial Park Aquatic Center (OMPAC)​
Location: South San Francisco, CA.
Brief: Construction of a 24,655-square-foot playground/park / athletic field; for site work for a playground/park / athletic field; swimming pool; and swimming pool. The new aquatic center will be a single-story, all-electric building and will include an outdoor 25-meter by 25-yard pool.
Scope of Work: BIM - Initiating Meeting - Coordination.
Jupiter Community Park Improvements
Location: Jupiter, FL.
Brief: playground/park / athletic field renovation and site work for a water/sewer facility
Scope of Work: Initiating Meeting - Activity List Draft Preliminary Schedule - Baseline Schedule - Monthly updates.
Park Turf Reduction, Phase 1 Project
Location: Modesto, CA.
Brief: Remove irrigated turf grass, trees, landscaping, and irrigation system components—installation of a new high-efficiency irrigation system, drought-tolerant landscaping, and organic mulch.
Scope of Work: Initiating Meeting - Activity List Draft Preliminary Schedule - Baseline Schedule - Monthly updates.
Inwood Hill Park Soccer Field Reconstruction (M042-120M)
Location: South San Francisco, CA.
Brief: Site work for a playground/park / athletic field in New York.
Scope of Work: Initiating Meeting - Activity List Draft Preliminary Schedule - Baseline Schedule - Monthly updates.
Construction of Pymatuning State Park - Rehabilitate State Park Campground Facilities
​Location: Linesville, PA
Brief: The project involves the rehabilitation of the park's infrastructure, amenities, and campsites. The work generally includes well pump installation, rehabilitation of buildings/water tower/pump stations, installation of water piping, repair and installation of sewerage piping, installation of all required electrical / controls, installation of pre-fabricated buildings, resurfacing of all roads, installation of boat ramp, and installation of a fishing pier.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Darby Park Restroom Phase 1
Location: Inglewood, CA.
Brief: Demolition, site work, and new construction of a playground/park / athletic field in Inglewood, California.Demo interior of the existing restroom to convert to a storage facility, demo existing wading pool, and construct new restroom building.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule.