Commercial & Residential
Norris Park Office Building
Location: Apex, NC.
Brief: Construction of Foundation - Slab On Grade - Tilt Up Panels - Slab On Metal Deck Structural Steel - exterior pavement - dumpster.
Scope of Work: Drawings Review - Site Management - Cost Estimation - Cost Control - Schedule Control - Baseline Schedule - Schedule Updates.


Low Country
Location: Charleston, SC.
Brief: Constructing a 52,000 square foot, state-of-the-art facility. The manufacturing space is divided into (4) separate divisions; cabinetry, millwork, finishing, and a climate controlled shipping department.
Scope of Work: Drawings Review - Ordering Materials -Estimate Change Order - Cost Control - Schedule control - Lifting sequence and crane path
Carolina Commercial Parkway
Location: Charleston, SC.
Brief: Construction of Foundation - Slab On Grade - Tilt Up Panels - Slab On Metal Deck Structural Steel.
Scope of Work: Checking drawings - Ordering materials - Estimate change order - Cost Control - Schedule Control - Lifting sequence - crane path.


Cross pointe Church
Location: Cary, NC.
Brief: They needed to extend the project by adding 92,363 square foot to the existing structure. The method of construction used was Tilt Up construction.
Scope of Work: Drawings Revision - Simulate the lifting sequence using Revit - Preliminary Schedule - Baseline Schedule - Monthly Schedule updates - Schedule Control - Cost Estimation - Cost Control - Progress field meetings to check safety, quality - solve onsite issues and attend preconstruction and pre-pour meetings.
Bishop Grant Lot 9
Location: Wake Forest, NC.
Awarded Company: YZ Homes
Brief: Constructing a house from the permit phase till the finishing and close out.
Scope of Work: Preliminary Schedule - Baseline Schedule - bi-weekly Schedule updates - Schedule Control - Cost Estimation - Cost Control -


Kabab Skewer Restaurant
Location: Cary, NC.
Brief: Renovation of the whole restaurant.
Scope of Work: Remodeling - scheduling.
Cary MOB
Location: Cary, NC.
Awarded Company: Healthcare trust of America Inc.
Brief: Construction of Three stories Medical offices building.
Building size equals to 56,865 square foot.
Scope of Work: Checking Drawings- Ordering Materials - Estimate Change Order - Cost Control - Schedule Control.


Belle Hall Office Building
Location: Mount Pleasant, SC.
Brief: Construction of Foundation - Slab On Grade - Tilt Up Panels - Slab On Metal Deck Structural Steel.
Scope of Work: Checking drawings - Ordering materials - Estimate change order - Cost Control - Schedule Control - Lifting sequence - crane path.

Perimeter Park Office Building
Location: Morrisville, NC.
Brief: Construction of Foundation - Slab On Grade - Tilt Up Panels - Slab On Metal Deck Structural Steel for Office Building:
1st floor= 33,004 2nd floor= 33,516
3rd floor= 33,516 Total= 100,036 sf
Scope of Work: Cost Estimation - Cost Control - Preliminary Schedule - Baseline Schedule - Schedule Updates.
Humie Olive Subdivision
Location: Apex, NC.
Awarded Company: YZ Homes.
Brief: Constructing a subdivision including 8 Town Houses
Scope of Work: Preliminary Schedule - Baseline Schedule - bi-weekly Schedule updates - Schedule Control - Cost Estimation - Cost Control for the whole project including the subdivision and the houses.


MYCC Community Center
Location: Raleigh, NC.
Awarded Company: MYCC.
Brief: Constructing of a Community Center that consists of 20,000 sf building with Gym, classes, event rooms, and indoor basketball. On the outside it has a soccer field, 1 volleyball fields, another basketball field, parking lots and green areas.
Scope of Work: Preliminary Schedule - Baseline Schedule - bi-weekly updates - Schedule Control - Cost Estimation - Cost Control -
Gateway
Location: Mount Pleasant, SC
Brief: Construction of Foundation - Slab On Grade - Tilt Up Panels - Slab On Metal Deck Structural Steel - exterior pavement and dumpster
Scope of Work: Drawings Review - Ordering Materials -Estimate Change Order - Cost Control - Schedule control - Lifting sequence and crane path


Oasis Subdivision
Location: Raleigh, NC.
Awarded Company: YZ Homes.
Brief: Constructing an 11 acre subdivision including around 33 duplexes and three story houses.
Scope of Work: Preliminary Schedule - Baseline Schedule - bi-weekly Schedule updates - Schedule Control - Cost Estimation - Cost Control for the whole project including the subdivision and the houses.