Commercial & Residential

Norris Park Office Building

Location: Apex, NC.

Brief: Construction of  Foundation - Slab On Grade - Tilt Up Panels - Slab On Metal Deck Structural Steel - exterior pavement - dumpster. 

Scope of Work: Drawings Review - Site Management - Cost Estimation - Cost Control - Schedule Control -  Baseline Schedule - Schedule Updates.

inset-norris-park-sign.jpg
0339da36-f7b7-4a40-9bca-13351f8013c2.jpg

Low Country

Location: Charleston, SC.

Brief: Constructing a 52,000 square foot, state-of-the-art facility. The manufacturing space is divided into (4) separate divisions; cabinetry, millwork, finishing, and a climate controlled shipping department.

Scope of Work: Drawings Review - Ordering Materials -Estimate Change Order - Cost Control - Schedule control - Lifting sequence and crane path

Carolina Commercial Parkway

Location: Charleston, SC.

Brief: Construction of Foundation - Slab On Grade - Tilt Up Panels - Slab On Metal Deck Structural Steel.

Scope of Work: Checking drawings - Ordering materials - Estimate change order - Cost Control - Schedule Control -  Lifting sequence - crane path.

4136 Carolina Commerce Parkway.jpg
crosspointe-church-005-lg.jpg

Cross pointe Church

Location: Cary, NC.

Brief: They needed to extend the project by adding 92,363 square foot to the existing structure. The method of construction used was Tilt Up construction.

Scope of Work: Drawings Revision - Simulate the lifting sequence using Revit - Preliminary Schedule - Baseline Schedule - Monthly Schedule updates - Schedule Control - Cost Estimation - Cost Control - Progress field meetings to check safety, quality - solve onsite issues and attend preconstruction and pre-pour meetings.

Bishop Grant Lot 9

Location: Wake Forest, NC.

Awarded Company: YZ Homes

Brief: Constructing a house from the permit phase till the finishing and close out.

Scope of Work: Preliminary Schedule - Baseline Schedule - bi-weekly Schedule updates - Schedule Control - Cost Estimation - Cost Control - 

3d plan.jpg
large_EB01395C-F5E6-49A4-BCF6-1274EA17D98E.jpeg

Kabab Skewer Restaurant

Location: Cary, NC.

Brief: Renovation of the whole restaurant.

Scope of Work: Remodeling - scheduling.

Cary MOB

Location: Cary, NC.

Awarded Company: Healthcare trust of America Inc.

Brief: Construction of Three stories Medical offices building.

Building size equals to 56,865 square foot. 

Scope of Work: Checking Drawings- Ordering Materials - Estimate Change Order - Cost Control - Schedule Control.

RB_WakeMed_MOB_WEB.jpg
1.jpg

Belle Hall Office Building

Location: Mount Pleasant, SC.

Brief: Construction of Foundation - Slab On Grade - Tilt Up Panels - Slab On Metal Deck Structural Steel.

Scope of Work: Checking drawings - Ordering materials - Estimate change order - Cost Control - Schedule Control -  Lifting sequence - crane path.

2250-Perimeter-Park-Dr-Morrisville-NC-Building-Photo-1-Large.jpg

Perimeter Park Office Building

Location: Morrisville, NC.

Brief: Construction of  Foundation - Slab On Grade - Tilt Up Panels - Slab On Metal Deck Structural Steel for Office Building:

1st floor= 33,004   2nd floor= 33,516

3rd floor= 33,516   Total= 100,036 sf 

Scope of Work: Cost Estimation - Cost Control - Preliminary Schedule -  Baseline Schedule - Schedule Updates.

Humie Olive Subdivision

Location: Apex, NC.

Awarded Company: YZ Homes.

Brief: Constructing a subdivision including 8 Town Houses 

Scope of Work: Preliminary Schedule - Baseline Schedule - bi-weekly Schedule updates - Schedule Control - Cost Estimation - Cost Control for the whole project including the subdivision and the houses.

s (2).jpg
177447316_1178100215971706_6865650430406509592_n.jpg

MYCC Community Center

Location: Raleigh, NC.

Awarded Company: MYCC.

Brief: Constructing of a Community Center that consists of 20,000 sf building with Gym, classes, event rooms, and indoor basketball. On the outside it has a soccer field, 1 volleyball fields, another basketball field, parking lots and green areas.

Scope of Work: Preliminary Schedule - Baseline Schedule - bi-weekly updates - Schedule Control - Cost Estimation - Cost Control - 

Gateway

Location: Mount Pleasant, SC

Brief: Construction of Foundation - Slab On Grade - Tilt Up Panels - Slab On Metal Deck Structural Steel - exterior pavement and dumpster

Scope of Work: Drawings Review - Ordering Materials -Estimate Change Order - Cost Control - Schedule control - Lifting sequence and crane path

BentonHenry190511DJI_0106aaHR.jpg
1.png

Oasis Subdivision

Location: Raleigh, NC.

Awarded Company: YZ Homes.

Brief: Constructing an 11 acre subdivision including around 33 duplexes and three story houses.

Scope of Work: Preliminary Schedule - Baseline Schedule - bi-weekly Schedule updates - Schedule Control - Cost Estimation - Cost Control for the whole project including the subdivision and the houses.