Roads and Highways
CalTrans 04-1J5674 - Highway Planting and Irrigation Systems
Location: Palmdale, CA.
Brief: plans call for site work for a road/highway. Highway planting and irrigation systems.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
OHDOT - 230428 - Interchange - IR 71 - KT Holden construction
Location: Marengo, OH.
Brief: plans call for site work for a road/highway; and for paving for a road/highway. OHDOT - Interchange - IR 71
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
18th Street Corridor Improvements
Location: Virginia Beach, VA.
Brief: plans call for site work, and for paving for a road/highway. The sidewalks and curb will be replaced throughout the corridor, new neighborhood identifiers, and sidewalk furnishings will be installed, and new roadway and pedestrian lighting will be installed,
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
NJDOT-460- Route 52 Causeway Accent Lighting Rehabilitation
Location: Somers Point, NJ.
Brief: Plans call for site work and outdoor lighting for a road/highway. Route 52 Causeway Accent Lighting Rehabilitation,
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
A1A and Jupiter Beach Road Roundabout
Location: Jupiter, FL.
Brief: Site work and paving for a road/highway. This project consists of clearing & and grubbing, embankment, pavement widening, curb & and gutter, sidewalk, street lighting, decorative stamped asphalt, milling & and resurfacing, and all other required work to reconstruct the existing intersection at Jupiter Beach Road and A1A from a T-intersection to a roundabout.
Scope of Work: Initiating Meeting - Activity List Draft -Narrative Report - Preliminary Schedule - Baseline Schedule - Monthly updates.
Caltrans 04-1K7304 Remove and Replace Culverts, and Establish Erosion Control
Location: Jenner, CA.
Brief: plans call for site work, and replace culverts, and establishing erosion control. work road/highway.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Pavement Preservation Southern Utah & Pavement Preservation Great Basin
Location: Southern Utah.
Brief: Plans call for Maintenance, Paving/Reconstruction, Site Development Construction
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Hufsmith Kohrville Road Segment 2
Location: Tomball, TX.
Brief: plans call for site work for a 4,500-square-foot road/highway, Reconstruction, and widening of a 2-lane asphalt roadway into a 4-lane concrete boulevard. The existing roadway is to be removed and a new roadway is to be constructed.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Caltrans 08-1L7014 Electric Vehicle Charging Station Systems
Location: Yucaipa, CA.
Brief: plans call for site work for a road/highway. Electric Vehicle Charging Station Systems.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Caltrans - 05-1P5354 Irrigation, Planting, and concrete Work
Location: Oceano, CA
Brief: Plans call for site work for a road/highway. Irrigation, planting, and concrete work.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule - Monthly Updates.
FDOT - E4V54- Intersection Improvement- SR 809-Military Trail
Location: West Palm Beach, FL.
Brief: plans call for site work, paving for a road/highway. Counties: Palm Beach Road Name: SR-809/military Trail at Forest Hill Blvd.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule - Cost Loading - Narrative Report.
VDOT - H60 - Oak Street Bridge Replacement.
Location: Dunn Loring, VA.
Brief: Demolition, site work, paving, and new construction of a bridge/tunnel in Dunn Loring, Virginia.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule - Cost Loading - Narrative Report.
MASSDOT613195-Bridge Preservation
Location: E Sandwich, MA.
Brief: plans call for site work, and paving for a bridge.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Caltrans 07-352004 - Modify Signal and Lighting Systems
Location: Long Beach, CA
Brief: plans call for site work for a road/highway; and for outdoor lighting for a road/highway. Modify signal and lighting systems.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
FDOT - T4649 - Steel Sheet Piling / Milling & Resurfacing / Drainage Improvements.
Location: Indiantown, FL.
Brief: plans call for site work, paving for a road/highway; and for a water/sewer project. Steel Sheet Piling / Milling and Resurfacing Drainage Improvements / Base Work.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule - Cost Loading - Narrative Report.
Caltrans 10-0X7524 - Bridge Widening and Upgrading Rails
Location: Plymouth, CA.
Brief: Site work and paving for a paving, Bridge widening, and upgrading rail bridge/tunnel in Plymouth.
Scope of Work: Preliminary Schedule - Baseline Schedule - Cost Loading - Monthly Updates
PennDOT-Woodland Ave to Bartram Ave - D/B activities limited to: ADA Ramps and MPT
Location: Homestead, FL.
Brief: plans call for Site work, Paving, the addition of grass median and bicycle lanes, traffic signal improvements, roadway resurfacing and striping, ADA improvements, reconstruction of trolley platforms,
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Caltrans 07-352104 - Install Traffic Signal System and Upgrade Curb Ramps
Location: Palmdale, CA.
Brief: Plans call for site work for a sidewalk/parking lot; for paving for a sidewalk/parking lot; and road/highway. Install traffic signal system and upgrade curb ramps.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
PennDOT 116255 Palmer St Enhancements R7
Location: Philadelphia, PA.
Brief: Site work, paving and outdoor lighting for a mixed-use development in Philadelphia, Pennsylvania. Completed plans call for Site work, paving and outdoor lighting for a road / highway; sidewalk / parking lot.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule - Monthly Updates.
07-0W4004 - Concrete Pavement Slabs Replacement and Slurry Shoulder
Location: Oxnard, CA.
Brief: plans call for site work, and paving for a road/highway. Concrete pavement slab replacement & slurry shoulder.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule - Narrative Report.
FDOT - E6M36 - Bike Path/Trail Improvements
Location: Surfside, FL.
Brief: plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot. Counties : Miami-dade Road Name : Sr A1a/macarthur Cswy Fr Biscayne Blvd to Alton Rd
Scope of Work: Preliminary Schedule - Baseline Schedule - Cost Loading - Monthly Updates
SCDOT - 060 - Rehabilitation - S-98 (Chas Co)
Location: Isle of Palms, SC.
Brief: Plans call for Site work and paving for a road/highway in Isle of Palms.
Scope of Work: Preliminary Schedule - Baseline Schedule - Cost Loading - Monthly Updates
Caltrans-04-3J1404 Install Accessible Pedestrian Signals, Crosswalk Markings and AC Pavement
Location: Blackhawk, CA.
Brief: plans call for site work for a road/highway; and for paving for a road/highway. Install accessible pedestrian signals, crosswalk markings, and AC pavement At Various Locations.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule.
Everglades National Park NP SER PMS FY22
Location: Homestead, FL.
Brief: plans call for site work for a road/highway; and for paving for a road/highway.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Installation of Complex Pedestrian Ramps
Location: New York, NY.
Brief: plans call for site work, outdoor lighting, and paving for a road/highway; sidewalk/parking lot.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Caltrans 11-2N1214 - Microsurfacing, shoulder backing, rumble strip, & striping
Location: Tecate, CA.
Brief: plans call for site work for a road/highway; and for paving for a road/highway. Micro-surfacing, shoulder backing, rumble strip, & striping.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Caltrans - 06-0W15V4 - Modify Signal and Lighting Systems and Replace Curb Ramps
Location: Bakersfield, CA
Brief: plans call for site work and Paving for a road/highway; for outdoor lighting for a road/highway; sidewalk/parking lot; Modify signal and lighting systems and replace curb ramps.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule.
Caltrans 10-1L6304 - Install High Tension Median Barrier
Location: Los Banos, CA
Brief: plans call for site work for a road/highway. Install high-tension median barrier. 10-Mer-152-R10.1/13.9 10200000851 In Merced County In And Near Santa Nella From 0.8 Mile West Of Gonzaga Road To 1.6 Miles East Of Hilldale
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Caltrans - 05-1P5374- Irrigation, Planting, Lighting and Decorative Banners and Crosswalks
Location: Santa Maria, CA.
Brief: plans call for site work, paving, and outdoor lighting for a road/highway.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule.
CALTRANS- 12-0T3404 Orange County
Location: Tustin, CA.
Brief: Site work and paving for a road / highway in Tustin, California. Completed plans call for site work for a road / highway; and for paving for a road / highway. Planting, irrigation, rock blanket, fence and concrete grid paving.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule - Monthly Updates.
CALTRANS (07-320204) Plant Vegetation and Install Irrigation
Location: Los Angeles, CA
Brief: Site work for a water / sewer project in Los Angeles, California. From 0.2 Mile South Of Burbank Boulevard Overcrossing To 0.3 Mile North Of Rinaldi Street Undercrossing
Scope of Work: Preliminary Schedule - Baseline Schedule - bi-weekly Schedule updates - Schedule Control - Cost Estimation - Cost Control for the whole project including the subdivision and the houses.
Leffingwell Road TSSP Imperial Highway to Tigrina Avenue
Location: La Mirada, CA.
Brief: plans call for site work, and Paving for a road/highway; sidewalk/parking lot, installation and modification of traffic signals, and the performance of other appurtenant work.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly Update.
Caltrans 07-351804 - Upgrade Traffic Signals and Curb Ramps
Location: Los Angeles, CA.
Brief: plans call for site work for outdoor lighting, paving, Modify signal, lighting, and ramp metering systems for a road/highway; sidewalk/parking lot.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Caltrans 10-1G2504 - Construct Curb Ramp, Sidewalk and Driveway
Location: Dos Palos, CA
Brief: Plans call for site work for paving for a sidewalk/parking lot. Construct curb ramp, sidewalk, and driveway.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
06-1A6904 - Construct High-tension Median Cable Barrier With Vegetation Control
Location: Bakersfield, CA.
Brief: plans call for site work for a road / highway. Construct high-tension median cable barrier with vegetation control
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule.
04-1K7504- Remove Culvert, RCP, Corrugated Steel Pipe and Concrete
Location: Jenner, CA.
Brief: plans call for site work for Removing culvert, RCP, corrugated steel pipe, and concrete backfill.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
MassDOT609385 ADA Retrofits
Location: Holyoke, MA.
Brief: Plans call for site work for a sidewalk/parking lot.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule.
10-1P7104 - Bridge Polyester Concrete Overlay
Location: Stockton, CA.
Brief: plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel. Bridge polyester concrete overlay.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
04-3W5504- Replace Joint Seals and Place Polyester Concrete Overlay
Location: San Carlos, CA.
Brief: plans call for site work, paving for a road/highway, Polyester concrete overlay, and replace joint seals.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Applegrove and Strip (Part A) and Frank and Strausser (Part B)
Location: Canton, OH.
Brief: plans call for site work, and paving for a road/highway; sidewalk/parking lot.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Regnart Road Improvements Phase 1
Location: Cupertino, CA.
Brief: plans call for site work, and paving for a road/highway. Road reconstruction includes excavation, widening, retaining walls, drainage inlet work, and asphalt pavement work to mitigate roadway embankment distress and cut slope failures.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Construction of Port Street Lucie Boulevard North Roadway
Location: Port St Lucie, FL.
Brief: plans call for site work, and paving for a road/highway, sidewalk/parking lot.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
10-1H6504-Highway Planting and Irrigation
Location: Lodi, CA.
Brief: plans call for site work for a road/highway. Highway planting and irrigation.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
CALTRANS -07-319304 - Install Roadside Warning Signs
Location: Los Angeles, CA.
Brief: plans call for site work for a road / highway. Install roadside warning signs.
Scope of Work: Initiating Meeting - Activity List Draft - Preliminary Schedule - Baseline Schedule - Monthly updates.
Caltrans-04-2J9504 Modifying Ramp Metering Systems and Place HMA
Location: San Jose, CA.
Brief: plans call for site work, paving, Modifying ramp metering systems, and placing HMA (Type A) for a road/highway.
Scope of Work: Initiating Meeting - Activity list Draft - Preliminary Schedule - Baseline Schedule.
North Maple Extension
Location: Summerville, SC.
Brief: Site work and paving for a road/highway in Summerville, The work includes grading, drainage, and paving for S-59 (Parsons Road), S-131 (North Maple Street), S-65 (W Richardson Avenue, and US 78 (W 5th N Street). Work also includes the relocation of S-59 (Parsons Road), pavement markings, signing, and traffic control for the entire project, and street lighting along S-131 (North Maple Street).
Scope of Work: Preliminary Schedule - Baseline Schedule - Cost Loading - Monthly Updates
70th Street South over Delaney Creek
Location: Tampa, FL
Brief: Site work and paving for a road / highway; sidewalk / parking lot