top of page
Cranes

BIM Samples

1.png

Tamarind Pump Station

Fontana, CA.

​

Brief: Work includes removing existing electrical equipment, pumps, piping, fences, concrete, asphalt, top slabs, wet well liner, and building, pipe abandonment, and installation of new pumps, piping, standby generator, odor control system, top slabs, hatches, wet well supports, coating wet wells and manhole, fences, gates, shade structure, and electrical equipment

Scope of Work: Building Information Modeling

3.png
1.png

G-Street Pump Stations

Chula Vista, CA.

​

Brief: Work includes Installation of two parallel 16-inch OD (12.33-inch ID) sewer force main pipelines from the G St Sewer Lift Station

Scope of Work: Building Information Modeling

3.png

Trout Rearing Facility Raceway Replacement

Gatlinburg, TN.

​

Brief: plans call for site work for a water/sewer facility and a road/highway.

Scope of Work: Building Information Modeling

2.png
1.png

Industry Pump Station

Fontana, CA.

​

Brief: Work includes removing existing electrical equipment, pumps, piping, fences, concrete, asphalt, top slabs, wet well liner, and building, pipe abandonment, and installation of new pumps, piping, standby generator, odor control system, top slabs, hatches, wet well supports, coating wet wells and manhole, fences, gates, shade structure, and electrical equipment

Scope of Work: Building Information Modeling

3.png
OMPAC_edited.jpg

​

In Progress

Orange Memorial Park Aquatic Center (OMPAC)

South San Francisco, CA.

​

Brief:  plans call for the construction of a 24,655-square-foot playground/park / athletic field and swimming pool.

Scope of Work: Building Information Modeling

OMPAC_edited.jpg

​

In Progress

Ceter_edited.jpg

​

In Progress

Center for Domestic Peace

South San Francisco, CA.

​

Brief:  plans call for the construction of a 24,655-square-foot playground/park / athletic field and swimming pool.

Scope of Work: Building Information Modeling

​

In Progress

bottom of page