top of page
ej-yao-D46mXLsQRJw-unsplash.jpg

Our Services

CPM-Schedule-1.jpg

CPM Scheduling

Critical Path Method is a project management methodology that allows companies to expose all aspects of project scopes, needs, and required sequences and identify high-risk tasks before the project is constructed and potential problems are exposed too late.

Building Information Modeling (BIM)

Building Information Modeling (BIM) is a highly collaborative process that allows architects, engineers, real estate developers, contractors, manufacturers, and other construction professionals to plan, design, and construct a structure or building within one 3D model. 

What Is BIM _ Building Information Modeling _ Autodesk (1)_edited.jpg
TIA.avif

Time Impact Analysis (TIA)

Time Impact Analysis (TIA) assesses the impact of potential construction delays by adding delay activities to the project schedule. It evaluates how these changes affect the overall timeline, providing insights to mitigate risks. TIA helps ensure informed decisions and successful project delivery.

Shop Drawings

A shop drawing is a detailed blueprint used in construction to show how components will be fabricated, assembled, or installed, including dimensions, materials, and specifications. It ensures alignment with design and engineering requirements. It helps prevent conflicts and ensures accuracy and efficiency.

CPMSH.png
CPMC.png

Clash Detection

Clash detection is the process of identifying and resolving conflicts between different building systems or components in a project. It ensures that designs are coordinated and that potential issues are addressed before construction begins. It helps prevent costly delays, rework, and errors during the construction phase.

bottom of page